hello All,
i'm planning to move ECC 6 enviroment to new hardware & location.
central service & databases are hosted on the oracle cluster nodes.
there are more than one instance hosted in the same cluster.
operating system (rhel) & oracle version is not changing on the new hardware.
i Wanted to move with minimum down time and db size about 10tb.
I have following question need your advise if you have any idea and done such move in your experience. I have installed new cluster with OS with cluster configure with two nodes
1. I'm planning to images disks as-is and mount onto new cluster nodes. By doing this do I have install certral service ?
2. If I had to move one instance at time, do I have to install on each move ?
3. What Other methods I have, to move each instance to new hardware
aany thought is much appreciated
thank u in advance!
cheers
CG