Re: SAP IBP Supply Planning in SOP SAP2

$
0
0

Hi, i am performing an unconstrained Planning for Supply SAP2 like bellow, but the material "14130209" does not load into the resource "T011".


 

if i am correct the calc needs to be for the Bucket Jul/2016:

 

A - 0.000445(Weight per part in Ton) * 8,000,000(Consensus Demand Plan Qty) = 3560 (Ton loaded into resource)

 

B - 3560 / 2300(Available Capacity)  = 158% Capacity Load

 

ScreenHunter_37 Jul. 06 09.33.jpg

 

this is the process flow:

 

ScreenHunter_41 Jul. 06 09.48.jpg

 

 

 

These are all parameter envolved for product 14130209 ,customer 1046141, Location T011, Resource T011 EXTRUSAO,

 

ScreenHunter_38 Jul. 06 09.34.jpg

 

 

the Supply Planning Heuristic log show me

 

ScreenHunter_42 Jul. 06 09.49.jpg

 

 

 

 

 

 

 

Thanks!

Fábio Matias