Hi, i am performing an unconstrained Planning for Supply SAP2 like bellow, but the material "14130209" does not load into the resource "T011".
if i am correct the calc needs to be for the Bucket Jul/2016:
A - 0.000445(Weight per part in Ton) * 8,000,000(Consensus Demand Plan Qty) = 3560 (Ton loaded into resource)
B - 3560 / 2300(Available Capacity) = 158% Capacity Load
this is the process flow:
These are all parameter envolved for product 14130209 ,customer 1046141, Location T011, Resource T011 EXTRUSAO,
the Supply Planning Heuristic log show me
Thanks!
Fábio Matias